• BULLI BRICK WORKS SUBDIVISION


    • Preparation of a development approval plans including design concept for a RTA dual carriageway bridge spanning 23 metres and 18 metres wide. The Subdivision also included the development of both concept and detailed design plans for construction.

      CLIENT
      Village Building Company

      PROJECT TASKS
      • Professional  services provided include:
      • Concept bridge design
      • Liaising with government authorities including RTA
      • Concept stormwater and road design
      • Detailed subdivision cost estimates for each stage of construction
      • Detailed On–Site Detention system design
      • Implementation of Water Sensitive Urban Design measures.

      ENGINEERING DISCIPLINE RESPONSIBILITIES
      • Development of Flooding reports, attaining the 100yr and Max Probable Flood levels for the site
      • Preparation of the bulk earthworks volumes and level coordination for the entire site
      • Concept and construction level designs for all the civil infrastructure across each stage  of the subdivision including drainage, roads and Water Sensitive Design measures
      • Co-ordination with project team including Architects, Planners, Landscape Architects, Engineers  and Geotechnical Engineers.


    • Project Images


      Click on an image below to enlarge:

Home | Services | Projects | News | About Us | News / Media | Contact Us | Site Map