Preparation of a Feasibility study for an 820 metre long dual carriage way access road from Mill Park to Casula Powerhouse. The designs explored were cost effective and robust solutions to facilitate public pedestrian and vehicular movements.
CLIENT
Liverpool City Council
PROJECT TASKS
- Professional services provided include:
- Liaising with relevant Authorities
- Concept road and drainage design options,
- Detailed costing for each design option and
- Evaluation of each design
- Preparation of report including
- Advantages and disadvantages of each option
- Recommendation of preferred option and supporting rationale.
ENGINEERING DISCIPLINE RESPONSIBILITIES
- Feasibility Report including site analysis, services investigation, traffic studies and evaluation, pavement design, water sensitive urban design principles, bank stablisation, riparian management, and development of design concepts
- Co-ordination with project team including Planners, Landscape Architects, Engineers and Geotechnical Engineers.